Digger magazine

Serving the Northwest Nursery Industry for Over 50 Years

  • Farwest-50th-banner-DM.com-728x90-1.jpg
  • NGW-728x90-v2.png
  • Digger-Employment_banner-2020-728x90px.jpg
  • NG-Survey-banner-728x90-1.jpg
  • Home
  • Articles
    • Nursery News
    • Features
    • Plants
    • Growing Knowledge
    • Operations
    • Nursery Country
  • Issues
  • Events
  • Farwest
  • Columns
    • Director’s Desk
    • Mike Darcy
    • Pivot Points
    • President’s Message
  • Employment Classifieds
  • Advertise
  • Subscribe to Digger
You are here: Home / Nursery Operations / Keeping things moving

Keeping things moving

By Jon Bell — Posted April 26, 2019

JLPN employees assemble soil mixtures and plants in a production line JLPN. Photo courtesy of JLPN

JLPN employees assemble soil mixtures and plants in a production line JLPN. Photo courtesy of JLPN

The Lean concept of continuous flow delivers big for Oregon’s nurseries

Twenty people to five.
A quarter-mile span to 20 feet.
One week to 20 minutes.

What do these all have in common? They are all some of the head-scratching efficiencies that individual nurseries across Oregon have realized since they’ve implemented one key Lean concept — continuous flow. In short, it means efficiently moving materials through a streamlined production process from start to finish.

“It’s made a big difference for us,” said Tristan Wampole, continuous flow manager at Kraemer’s Nursery in Mt. Angel, Oregon. “There’s a big drive in the horticulture industry in general, because labor is getting more expensive and harder to find, to figure out ways to be more efficient.”

For Wampole and Kraemer’s, continuous flow has so far made the biggest dent in the company’s process for building its shipping racks. That process had been a hectic, disorganized one that found workers trying to do too many tasks at once with no real direction or flow. After implementing continuous flow, however, the process became a tight assembly line that produces one shipping rack at a time, progressing from one step to the next until a rack is complete — and not starting on another until finishing the one being built.

The result? Not only has Kraemer’s sliced its average time to build 10, four-shelf racks from about 57 minutes to just 30, but it’s also all but eliminated any kinds of defects in the finished products.

“Before (continuous flow) we had an average of nine defects for every 10 racks,” Wampole said. “After it, we only had one defect, and that was with a crew who had never done it before. We saw quite a big improvement.”

Beneficial array

So what, exactly, is continuous flow? In Lean manufacturing, it’s about efficiently moving a single unit through each step of the manufacturing process from beginning to end, rather than multiple units at a time. The method works well in high-demand situations because it ensures a continuous flow of materials is constantly passing from step to step.

Continuous flow can also be incredibly advantageous in a nursery setting for an array of processes. Kraemer’s shipping rack example is just one.

Robinson Nursery employees ride tractor to prune in line. Photos by Bill Goloski

Robinson Nursery employees ride a tractor to prune in line. Photos by Bill Goloski

At Robinson Nursery Inc. in Amity, Oregon, nursery manager Chris Robinson said he began incorporating Lean into the nursery about seven years ago. Two years ago, he said, they got serious about it; they also hired Lean consultants The Peters Company (Wilsonville, Oregon).

The nursery has implemented continuous flow on its potting line, mechanizing it so that it the soil gets mixed, dropped into the potting machine, pots get filled — one at a time — plants get planted, they get a hazelnut top dress and then they’re packed on a trailer.

Doing that alone boosted production by nearly 50 percent, Robinson said.

“The key to continuous flow is transforming one piece at a time,” he said. (It was also Robinson Nursery that significantly shrunk its bare root processing area and saw production jump by close to 40 percent)

John Lewis of JLPN Inc., a Salem, Oregon seeding operation and nursery, saw similar benefits with continuous flow in his soil production and planting line.

“At the start of the line, you have all of the soil components, and at the end of the line, a flat of Anderson band pots comes out, fully mixed, filled, planted, topped and watered, then off to the greenhouse it goes,” he said. “The entire cycle might take 20 minutes from a pile of bark to a planted flat sitting in the greenhouse. In the past, this cycle from start to finish could have easily been a week.”

Another area that has benefited from continuous flow is tending to trees in the nursery. Since the trees are in the ground, they can’t be brought inside to an assembly line kind of process. Instead, Robinson has devised platform attachments for tractors, which workers ride on to tend to each required process, like staking and fertilizing.

“Basically, anything we do is one continuous flow,” Robinson said. “Since the trees are stationary, we move the people through the process and get the same kinds of results.”

Buying in

One of the keys for successfully implementing continuous flow is identifying the problems that are causing the inefficiencies in the first place. That might be one of the easier tasks.

The more difficult part can be getting employees on board.

“I would say it was somewhat of a struggle to get the buy-in to change the way they’ve done things for 15 years,” Wampole said. “But with our first big win, we’ve been trying to celebrate it as a company and hope that it inspires the team.”

Robinson said a similar resistance to change has been evident at his family’s nursery, so he’s tried to ensure that the workers play a big role in the continuous flow solutions.

“If they help develop their own process, it’s sustained, because they view it as their own,” he said.

At JLPN, Lewis said continuous flow has made longer, more difficult tasks easier and shorter, which helps ease stress and makes working less of a strain for employees. JLPN workers also get bonuses when they save the company money, so there’s real incentive to make continuous flow work well.

And even though nurseries can see real improvements in their operations through continuous flow in just a handful of areas, as with all Lean components, the story never really ends. Even though Kraemer’s Nursery already improved its shipping process, it will revisit it again shortly. It will also be sizing up its propagation facility and working with its watering and planting crews as part of an annual set of improvement targets.

Lewis and Robinson will be soldiering on in the same way, too.

“This is just the start,” said Robinson. “We all strive for perfection, but we’ll never get there.”

Download a PDF of this article

Filed Under: Nursery Operations Tagged With: Business, Digger, Digger magazine, Efficiency, lean, Operations, Wholesale Nurseries

NURSERY NEWS

Hall of Famers give gift towards horticultural industry advocacy

Verl Holden retires from Oregon Garden Foundation Board

Fall Creek promotes Dave Daniel to general manager for U.S. and Canada

NWFCS, Farm Credit West create new association

Bailey Nurseries announces leadership transition

More Nursery News

FARWEST SHOW UPDATES

Secure your 2023 Farwest hotel room and save

Farwest Show to celebrate 50th anniversary in 2023

Nursery professionals connect at Farwest

These 12 products had buyers buzzing at Farwest

Nightfall Snowbell sweeps top honors in Farwest New Varieties Showcase

More Updates from Farwest

From the pages of Digger

March 2023: Water Outlook 2023

February 2023: Greenhouse Issue ’23

January 2023: The Retail Issue

December 2022: Oregon is Nursery Country

November 2022: Transportation and Logistics

More issues of Digger

The Value of Membership

OAN Member Profile: Oregon Flowers Inc. 

These 12 products had buyers buzzing at Farwest

Creating the future generation of nursery leaders

More member stories

CORONAVIRUS COVERAGE

Virtual is the new reality – for now

Trade shows in the time of COVID

A demand ‘renaissance’ for nurseries

Western Nursery & Landscape Association falls victim to pandemic

MANTS 2021 to move online due to COVID-19

More articles

Nursery Guide LIVE

Nursery Guide LIVE clicks into place

Booth spaces still available for Nursery Guide LIVE March 17–18

Nursery Guide LIVE virtual marketplace postponed due to winter storm damage

Keynote presentations at Nursery Guide LIVE virtual marketplace provide insight on green industry trends in 2021 and beyond

More Posts from this Category

​

Updates to exisiting subscriptions can be sent to info@oan.org

News

  • Nursery News
  • Growing Knowledge
  • Nursery Operations

Features

  • Plant Features
  • OAN Members
  • Oregon Nursery Country

Columns

  • Director’s Desk
  • Mike Darcy
  • Pivot Points
  • President’s Message

Resources

  • OAN Home Page
  • Job Listings
  • Subscribe to Digger
  • Advertise in Digger
  • Online Plant Search

© Copyright 2022 Oregon Association of Nurseries · Admin